Deemed consent for advertisements
The term ‘deemed consent’ refers to the automatic consent permitted for types of advertisements listed in Schedule 3 of the Town and Country Planning (Control of Advertisements) (England) Regulations 2007.
There are 17 classes of advertisement in Schedule 3, each of which has its own criteria and conditions that must be satisfied. If the relevant conditions are not satisfied, then express consent is required from the local planning authority. In addition, local planning authorities can apply to the government for a regulation 7 direction to remove or restrict deemed consent for a particular area.
Advertisements listed in Schedule 1 of the regulations are permitted without consent from the local planning authority. Advertisements not listed in Schedule 1 or 3, or listed in Schedule 3 but not complying with the conditions, require ‘express consent’ from the local planning authority. See advertisement consent for more information.
[edit] Related articles on Designing Buildings Wiki.
- Advertisement consent.
- Letting boards regulation 7 direction.
- Listed buildings.
- Planning permission.
- Statutory approvals.
[edit] External references.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
An extraordinary record of steel engineering worldwide.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.
Construction's sustainability reporting revolution
Tracking upfront embodied carbon with digital tools.
ECA welcomes procurement reforms
Public spending must back British jobs and skills.
Campaigning for Edinburgh: the Cockburn Association 1875-2049
The role of the civic voice in protecting character. Book review.
CIOB photography competition is open for entries.
ECA Edmundson apprentice of the year award
Finalists announced.
Major new study exposes serious knowledge gaps.
Generating energy from internal light as well as sunshine.
ECA welcomes plans to strengthen subcontractor quality control.

















